What is a safe work method statement?
A SWMS is a document that sets out the high risk construction work activities to be carried out at a workplace, the hazards arising from these activities and the measures to be put in place to control the risks.
Table of Contents
What is a safe work method statement?
A SWMS is a document that sets out the high risk construction work activities to be carried out at a workplace, the hazards arising from these activities and the measures to be put in place to control the risks.

Who provides a method statement?
Method statements should be written by a competent person who is familiar with the process being described and may need to be agreed between the client, principal contractor and contractor.
How do you write a safety action plan?
The 5 Steps of a Safety Action Plan
- Identify all the hazards.
- Establish who is responsible for eliminating each hazard.
- Plan a course of action to remove the hazards.
- Take the necessary corrective actions to eliminate the hazards.
- Establish a system to prevent the hazard from returning.
What is a work health and safety management plan?
A WHS management plan is a document that sets out the key processes and systems for managing health and safety at a construction site. It must contain the items set out in Part 6 of the WHS Regulations.
What are the top 10 health and safety risks in construction?
The top ten risks and hazards from working on construction sites are:

- Working at height.
- Moving objects.
- Slips, trips, and falls.
- Noise.
- Hand arm vibration syndrome.
- Material and manual handling.
- Collapsing trenches.
- Asbestos.
How do you write a risk assessment and method statement?
There are 5 steps to risk assessment:
- Identify the hazards.
- Decide who might be harmed and how.
- Evaluate the risks and decide on precautions.
- Record your significant findings.
- Review your assessment and update if necessary.
What are the elements of a health and safety plan?
The elements that make up a Health and Safety Plan include:
- Contract description.
- Contract OH&S structure and system.
- Contract induction and safety training.
- Safe work practices and procedures.
- Risk assessment.
- Workplace health and safety inspections.
- Health and safety consultation.
- Emergency Procedures.
What 4 components must the Swms include?
What needs to be included in a SWMS?
- The details of the construction work that is considered high risk.
- The health and safety hazards relating to the work.
- The control measures that need to be implemented to minimise or remove the risks.
- How the control measures will be actioned?
- When will they be monitored and reviewed?
When should a risk assessment be carried out at your workplace?
The Health and Safety Executive (HSE) says risk should be assessed “every time there are new machines, substances and procedures, which could lead to new hazards.” An employer should carry out a risk assessment: whenever a new job brings in significant new hazards.
What are the 18 high risk construction activities?
18 High Risk Construction Work (HRCW) activities
- Risk of a person falling more than 2 metres.
- Work on a telecommunication tower.
- Demolition of load-bearing structure.
- Work on or near chemical fuel or refrigerant lines.
- Work on or near energised electrcal installation or services.
Do I need a method statement?
Taken from HSE: A safety method statement is not required by law. It describes in a logical sequence exactly how a job is to be carried out in a safe manner and without risks to health. It includes all the risks identified in the risk assessment and the measures needed to control those risks.
How do you write a method statement?
What Do I Need to Include in My Method Statement?
- The name of the project and its reference.
- A brief summary of what the work is.
- Where the work is taking place (address).
- Start and expected completion dates for the work.
- The issue date and the unique document number.
- Details about the company carrying out the activity.
What is a method statement risk assessment?
A method statement is a clear explanation of how you are going to manage risks identified during the risk assessment. The method statement describes the process, steps and resources required to carry out a task safely without risks to health.
What information should a method statement include?
A method statement will usually contain a lot of information about a task or activity such as:
- The project.
- The specific activity the method statement is for.
- A description of the work.
- Start date and duration of the task.
- Hours of work.
- Who the assessor is.
- Who has key responsibilities.
- Hazards associated with the task.
How do I create a workplace safety plan?
Follow these five steps to create a workplace safety plan for your business:
- Step 1: Inspect and improve your worksite.
- Step 2: Conduct a job safety analysis.
- Step 3: Put it in writing.
- Step 4: Train your employees.
- Step 5: Analyze accidents.
How do you implement a health and safety plan?
The key steps
- Decide on the preventive and protective measures needed and put them in place.
- Provide the right tools and equipment to do the job and keep them maintained.
- Train and instruct, to ensure everyone is competent to carry out their work.
- Supervise to make sure that arrangements are followed.
How do you write a safe work method?
Safe Work Method Statement (SWMS) Template
- List tasks involved and risk associated with each task.
- Take photo of the high-risk activity identified.
- Add comments and recommendations.
- Set and assign corrective measures through Actions; and.
- Complete the report by providing a digital signature.
What is the meaning of method statement?
Method statements are documents that detail exactly how to carry out work safely. When it comes to ensuring building site health and safety, method statements are key. The purpose of method statements is to describe the safety precautions to put in place to control risks identified in the risk assessment.
What is the difference between a job safety analysis and a safe work method statement?
A JSA is a form of risk assessment tool. It is sometimes referred to as a Job Safety & Environment Analysis (JSEA) if environmental components have been included in its content. A Safe Work Method Statement (SWMS) basically sets out the following information: work activities in a logical sequence.
What safe work practices should be adhered to at work?
Safe Work Practices
- Wearing gloves over clean hands when handling soiled clothes/linen and when cleaning bathroom or toilet area; to cover broken skin on hands etc;
- Wearing disposable gloves when dealing with bodily fluids;
- Gloves to be changed and hands washed between attending to different people or if the glove is punctured;
What is a site safety management plan?
Unique to a specific site, this OHS/WHS Site Management Plan outlines hazards, risks and processes relative to your specific project, addressing how the site is managed from day to day, and throughout the duration of the work contract.
What is a health and safety document?
Health and safety documents help you to control risks and communicate safe working procedures. Many health and safety documents are also required by law, like risk assessments and health and safety policies. These are templates that you can edit, fill in and use to create health and safety records.